Thanks for the response. Yes, I was definitely going to put in several blast gates. One at each tool.
I think I'm leaning towards foregoing the side inlets all together. It will be awkward to have two inlets, as the 240 degrees that would normally be open for debris to drop down in would have to be reduced.
I think I'm going to just go with a Y inlet into the top, and run each length of hose into the Y, with blast gates on all tools. I will take some pictures of the finished product, hopefully later today.
Thanks
I think I'm leaning towards foregoing the side inlets all together. It will be awkward to have two inlets, as the 240 degrees that would normally be open for debris to drop down in would have to be reduced.
I think I'm going to just go with a Y inlet into the top, and run each length of hose into the Y, with blast gates on all tools. I will take some pictures of the finished product, hopefully later today.
Thanks